Engineering

Project Risk Analysis - Hanging Climber

Qualitative vs. Quantitative Project Risk Analysis – What’s the Difference?

As part of risk management, a project risk analysis is performed to assess the impact of risks and the probability of the risk occurrence.  In this article we will look at the differences between qualitative and quantitative project risk analysis. To see how project risk analysis fits within risk management, please refer to this article. …

Qualitative vs. Quantitative Project Risk Analysis – What’s the Difference? Read More »

Dewar flask diagram

Monte Carlo Simulation of a Down Hole Dewar Flask

A Dewar flask is used in the oil & gas industry to protect electronics from high temperatures experienced down hole.  As temperatures increase, reliability of electronic components decrease and ultimately fail. We will analyze a Dewar flask design using Monte Carlo simulation of time down hole before an internal flask temperature of 435 Kelvin is …

Monte Carlo Simulation of a Down Hole Dewar Flask Read More »

Integration Using Monte Carlo Simulation

Monte Carlo integration can be used to estimate definite integrals that cannot be easily solved by analytical methods.  There are several methods to apply Monte Carlo integration for finding integrals.  In this article we will cover the basic or ordinary method. Basic Monte Carlo Integration Let’s start with a generic single integral where we want …

Integration Using Monte Carlo Simulation Read More »